Ashland Rd/I-64 Divergent Diamond Interchange

About

Goochland County has identified the interchange of Ashland Rd and I-64 as the top county transportation priority. The interchange was analyzed to determine a possible solution for the interchange, and a Divergent Diamond Interchange is the current proposed solution. This interchange design will accommodate the current demands on Ashland Rd as well as the planned growth along the corridor. The current scope of the project is to widen Ashland Rd to 4 lanes around the interchange and build a second bridge next to the existing bridge over I-64. 

Project Timeline

  • Preliminary Engineering: 2023-2025
  • Right of Way Acquisition: 2027-2028
  • Construction: 2028-2030
DDI Image