About
The study is intended to evaluate the existing and future traffic conditions to determine if additional access onto the limited access facility of Route 288 is warranted and justified to mitigate traffic operational or safety needs. The study will also give careful consideration to whether improvements to existing interchange and access points can achieve the same goal.
Timeline
- Study Kickoff: June 2021
- Anticipated Completion: Mid-2024
