About
The Hockett Rd Realignment project will consist of installing a single lane roundabout north of Holly Lane, connecting "New Hockett" to the existing Hockett Rd and Broad Street Rd. This project will create a 4 legged signalized intersection at Ashland Rd and Broad Street Rd. This project will alleviate the congestion issues currently seen at the existing Hockett Rd and Broad Street Rd intersection. Existing Hockett Rd will remain connected to Broad Street Rd at its current location.
Timeline
- Preliminary Engineering: 2023-2025
- Right of Way Acquisition: 2026-2027
- Construction: 2028-2029