Route 288 Southbound Auxiliary Lane

About

The Route 288 Auxiliary Lane will provide a full lane widening from Broad St to Tuckahoe Creek Parkway on Route 288. This will make Route 288 three lanes instead of two lanes in the southbound direction. This project will help alleviate some of the congestion on Route 288 during the rush hour.

Timeline

  • Preliminary Engineering: 2025-2026
  • Right of Way Acquisition: 2029-2030
  • Construction: 2031-2033