The County contracted with an engineering consultant and VDOT to determine the project that best solves the traffic concerns at this intersection. That analysis determined that a roundabout was the best solution. This roundabout will be similar to the one constructed at Fairground Rd and Route 522.


Timeline

  • Preliminary Engineering: 2026-2028
  • Right of Way Acquisition: 2028-2029
  • Construction: 2029-2030